Jul 11, 2024 | Residential
IMG_1273
Jul 10, 2024 | Residential
Jun 20, 2024 | Residential
Mar 18, 2024 | Commercial
2023.06.22 Olympic View Condominium Permit Submittal Set OLYMPIC VIEW ATRIUM S-DWGS 06-21-23 Olympic_Plan_Dims Olympic_Vert_Dims As Built elevation
Feb 24, 2024 | Residential
This project, started with complete interior demolition of the of the existing unit. https://hoedemakerpfeiffer.com/work/continental-place During the discovery phase we found that a second bathroom could be added, with the gracious permission of the owner of the unit...
Nov 30, 2023 | Residential
Mar 1, 2023 | Residential
Jul 1, 2020 | Residential
Jul 18, 2019 | Residential
This Phinney Ridge Residence had already under gone at least 6 remodels, the largest was a 3rd story master bedroom and bathroom. MLWgc remodeled the main floor by completing removing all of interior framing and the interior surfaces. The floor had a 2 1/2 inch slope...
Feb 11, 2018 | Residential
Feb 28, 2017 | Commercial
Feb 28, 2014 | Residential
Jan 19, 2013 | Residential
Bathroom suite remodel, also including removing a bedroom to an enlarged dining/living space.
Feb 16, 2012 | Residential
Post bases installed, posts colored and set up, templating with plywood the future panels. Shop built panels Using a mixture of salt and hydrogen peroxide we forced the parts to a rusted surface.
Jan 17, 2010 | Residential
Design by Ray Freeman. This project started with the demolition of the original 1 story home. Then the construction of a new residence using SIPS which allowed for a build with superbly insulated envelope. The 3 story tower has a seating room with a 360 degree viewing...
Oct 17, 2009 | Retail
Design by Ray Freeman, Workshop 3D ...
Mar 25, 2009 | Residential
Oct 19, 2008 | Residential
.
Mar 25, 2008 | Residential
Mar 25, 2004 | Residential
Feb 4, 2002 | Residential
Oct 19, 2001 | Residential
Feb 4, 2001 | Residential
Mar 25, 1996 | Commercial
Mar 24, 1996 | Residential
Oct 17, 1994 | Retail
Design by Workshop 3d
Mar 14, 1993 | Residential
This Residence near the Arboretum, was originally a 1 story bungalow. The building was tore down to the 1 st floor, the original brick was removed cleaned and stored at the site. Pin piles were placed along the east/alley elevation to support the foundation that had...
Mar 14, 1992 | Residential
Near Seward Park, on Lake Washington. MLWgc was contracted to add a 4thstory addition to this Lake Washington residence. This addition shows an extensive knowledge of framing to finish. In addition to the complicated framing, starting with carrying the structural...
Mar 23, 1990 | Residential
Master bathroom shower tile details
Oct 18, 1987 | Residential
Mar 24, 1987 | Commercial
MLWgc got to give an assist with this new retail build out. Some pretty crazy stuff here.
Feb 4, 1987 | Commercial
Oct 17, 1986 | Residential
Mar 24, 1986 | Commercial
At the time this was the last new undeveloped store front at the Inn at the Market. MLWgc installed exterior doors, tile floors, painted, and ground the concrete in selected locations to help create this small retail space.
Oct 15, 1984 | Residential
Design by Craig Wagner/Gideon and Ruth Kramer Complete demolition of old house, new foundation and build. Site access is by stairs, all materials were delivered via a temporary dolly system.