Market Condo Renovation
820 s.f. Condominium Renovation
The Fix Building, Seattle, WA
Ray C. Freeman III, Architect/Owner
When a 20″ water main between the Pike Place Market and the Waterfront broke, a million gallons of water came through this building. Almost everything in this unit needed to be replaced, from the flooring to the ceiling paint, with a suite of custom built-in furniture in between.


11′-6″ high wood ceilings. New engineered birch wood floors, new paint, including previously painted brick North and West walls. Restoration included adding a dishwasher, garbage disposal, and combo light duty washer/dryer.
Architect designed built-in furnishings (loft bed, wardrobes, dressers, cabinets and bookshelves) create separate areas for living, dining and sleeping.








posted 12/21/2025 Ray C. Freeman III